PROJECT:
Calderon Building – Robstown, Texas
MARKET:
Municipal
TYPE OF CONSTRUCTION:
Retrofit
PLATFORM/SYSTEM POINTS:
Niagara N4 – BACnet Integration of JCI Metasys
120 points
PROJECT CHALLENGE:
Existing JCI Metasys System did not have the capability for remote access. The existing front-end had out-dated software and was difficult for maintenance staff to operate.
PROJECT SOLUTION:
Installed new Honeywell JACE with local BACnet to IP router to integrate all existing BACnet points into our server. Created system and floorplan graphics and provided remote connection. System is part of the Nueces County wide supervisor building automation integration.