PROJECT:
Bishop Constable Building – Bishop, Texas
MARKET:
Municipal
TYPE OF CONSTRUCTION:
Retrofit
PLATFORM/SYSTEM POINTS:
Niagara N4 – BACnet
60 points
PROJECT CHALLENGE:
Existing packaged equipment was not automated and was run by local thermostats. The facility had no way to setback temperature and schedule start commands to rooftop units. Units failed to operate with non-communicating thermostats.
PROJECT SOLUTION:
Installed new Honeywell Webs Spyder controllers for the 6 rooftop packaged units. Created system and floorplan graphics which included engineering, programming and commissioning services. System is part of County wide supervisor building automation integration.